Before a pour, the responsible inspection process checks reinforcement against the issued information and confirms that formwork, cover, supports, laps, starters, openings, embedded items and cleanliness are acceptable. The exact checklist and approval authority belong to the project quality plan.
Information and revision status
The inspection should use the correct drawing and detail revisions. Outstanding technical queries or late design changes need to be closed or formally managed before concrete hides the work.
Visible installation checks
Typical checks consider bar identity and position, supports, cover, laps, tying, congestion, starters and penetrations. The project documents determine the acceptance criteria.
Release is a project hold point
The installer can prepare and self-check the work, but the person authorised to release the pour is defined by the inspection plan. Keep records where the project requires them.
Quick project checklist
- Correct revisions available
- Bars and mesh visibly complete
- Cover and supports in place
- Openings and embeds coordinated
- Named inspection release obtained
Questions people ask
Can photographs replace an inspection?
Only if the project's approved quality process says so. Photos can support records but do not automatically provide approval.
Should concrete be booked before inspection?
Bookings need programme coordination, but the team should allow enough time to resolve inspection issues before delivery.
General UK construction information only. Project drawings, specifications, appointments, contracts, competent advice and site controls take precedence.